Zurich Airport ZRH (CHE)
In 2022, ewo was commissioned to completely convert the airport's stands to LED lighting, resulting in significant energy and cost savings.
LED conversion with electricity savings at Zurich Airport
Since 2012, ewo has completed several contracts at Zurich Airport ZRH. In 2022, we were finally commissioned to completely convert the airport's stands to LED lighting.
The first construction work on Zurich Airport began in 1946 and it was finally officially opened in 1948. Today, Zurich Airport is the largest airport in Switzerland with around 29 million passengers and around 250,000 take-offs and landings per year.
In 2012, ewo installed a test mast with seven F32 floodlights, which convinced the customer and provided the impetus for several orders in the following years. In 2022, ewo was finally commissioned to equip the airport's stands with LED lighting. The lighting survey of the area after installation was carried out exclusively using the LightLogger measuring device developed by ewo.
The special feature of this project is the conversion from conventional lighting fixtures to LEDs. The following factors were decisive for the decision:
- Reduction of electricity consumption
- Reduction in maintenance costs
- Increased reliability and minimization of spare parts inventory
- Individual control options with DALI driver

© Oskar Da Riz
© Oskar Da Riz
Special requirements for a special system
To date, ewo has installed a total of 288 R–System gen3 R2 model floodlights on 116 poles around 25 m high at Zurich Airport—all the luminaires have EP09 asymmetrical lenses with combined left-right optics and full cuf-off.
In particular, the uniformity of the lighting achieved by the in-house developed optics has repeatedly resulted in positive feedback from Flughafen Zürich AG.
“The fact that we were ultimately able to prevail against global competitors once again confirms the high quality and technical innovation behind ewo's products.
Manuel Toni Streiter, Sales Manager ewo
Project details
Year
2023
Light Solution
R–System R2 gen3
Location
Airport Zurich, Switzerland
Client
Flughafen Zürich AG
Partner
Bartholet Maschinenbau AG
Your vision, our expertise.
Share your project idea with us—we look forward to mastering your challenge.
Get in touch with us!Related projects

Dubai Airport DXB (ARE)
Thanks to ewo's energy-efficient high-performance floodlights, Dubai International Airport saves over 60% in energy costs every year.

Munich Airport MUC (DEU)
ewo has equipped Munich Airport with high-performance floodlights, which have led to massive energy savings of 52% and thus also significantly reduced costs.

Thule Air Base, Avanersuaq (GRL)
ewo supplied lighting for the apron area of a hangar at Thule Air Base in Greenland that can withstand even the extreme polar climate.

Innsbruck Airport INN (AUT)
Innsbruck Airport is the first airport in the world to use energy-saving LED technology for its apron lighting with ewos.

ÖBB Cargo Terminal, Wolfurt (AUT)
In collaboration with Europoles, ewo has developed a lighting concept for the large Austrian freight center of the ÖBB.

Port of Venice (ITA)
At the Molo di Ponente port terminal in Venice, ewo achieved energy savings of over 80% with high-mast systems.

Royal Albert Dock, London (GBR)
The Royal Albert Dock project in central London showcases ewo's craftsmanship in complex metalwork.

Port of Fredericia (DNK)